One tonne of Wintinna coal yields a barrel of liquids plus power and industrial products – a significant order of added value beyond supplying just coal for conventional power generation.
The Based Case combines two 15KBPD Phases over a 4.5 year construction period, with a further 2.5 year Phase 3 expansion potentially increasing plant capacity to 45 KBPD and 840 MW of export power as markets develop.
The supporting mine can be developed and expanded within these timeframes. These Project parameters are based on pre-feasibility studies conducted by world class specialists in CTL plant and open cut mine design. |